求救翻译这段英文,不要机器的,在线等啊··帮帮小弟吧·谢谢

发布网友

我来回答

1个回答

热心网友

对于这样一个大而复杂的项目成功的一个关键因素是准确的

management of Concept Design phase.

概念设计阶段的管理。

The
Concept Design phase is the most important stage of a project and actions

概念设计阶段的项目和行动的最重要阶段

taken and
decisions made ring this period can significantly affect the budget,

考虑和决定在这段时间可以显着影响的预算,

schele
and quality of a project.

一个项目的进度和质量。

We will
be in contact with the Project Control Team to receive any information by

我们将与项目控制组接受任何信息的接触

providing
design services specifically tailored to meet the specific Project needs

提供设计服务,专为满足特定项目的需求

and
objectives.

和目标。

Create
the management structure in which all parties can effectively perform

创建管理结构中的各方都能有效的执行

their
ties with the combined aim of completing the Project to the time and cost

在完成该项目的时间和成本的综合目标责任

target,
and the quality/ function requirements set out by the Client.

的目标,和质量/功能要求的客户。

Create a
structured, positive and communicative environment within which the

创建一个结构化的,积极的和交际的环境内,

project
participants will be encouraged to operate.

项目参与者将被鼓励去操作。

Establish
proceres for implementing the Client’s instructions (including

建立执行客户指令程序(包括

changes).

的变化)。

Anticipate problems both on time and cost,
prepare solutions and recommend to

预计在时间和成本问题,准备解决方案和建议

the
Customer a corrective course of action;

客户的纠正行动;

Receive
instructions from the Client in connection with the Development and

接收指令从客户端连接和与发展

after
advising the Customer of the likely effect on cost, time and quality, take

在建议对成本的可能影响客户,时间和质量,以

whatever
action is necessary to comply with these instructions; establish

不管采取什么行动,遵守这些指令是必要的;建立

Development control and monitoring
systems.

系统开发控制与监测。

声明声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。E-MAIL:11247931@qq.com